We sat down today and planed out our first production
schedule. This one is for riverside country park. Above here is an image of our
plan that we wrote out. Last year we did this and, we found it very helpful as
it out liked everything we needed to bring and time schedule.
All three characters are needed for this location because
this is near the bagging when those all come together. Props the phones are
being used to show them listening to music though the earphones. These lines
back to our target audience as they listen to music a lot. The bags are there
to show we are carrying other items such as a phone, purse and make up. For
equipment a camera is very important as this is what we are using to film with.
We will also be bringing a tripod to keep the camera shots steady; we are also
using it because we want to do some three person shots. We are filming on Friday 13th October 2017 at 3pm which is after school. We also looked up the time the sun sets which are 18:10pm. We did this because we need these shots to be day time as this location is in our day time section. We also looked up the tide times, which were low 13:30 and 19:30n high. With this information we worked out that 15/16 will be a happy median as we would like water but not too much, as it might cover the paths.
When we go out filming we will be sharing all the roles as it would be fair that way. And that way everyone gets a chance to do something.