40. Winter Wonderland Production Schedule




We will be meeting on the 26th November to film more of our night time half of our music video. We have agreed to get the 14:47 train to St. Pancras which arrives in London at 15:37pm. This is because we want to arrive in London at dusk this way when we arrive at Hyde Park corner it will be dark and not too busy. From St. Pancras we are getting on the tube at 15:46pm tube to Hyde Parker Corner. This should get us at our destination around 16:00.
We will be needed all three character for the filming as this is near the end of our narrative. For props we need to bring phones, earphones, bags, money and drinks. This is because this is what we planned to do when we did our research. The equipment we are using is camera and change of clothes. We are being the camera for obvious reason as this is what we were using to film with. And the change of clothes is because we still have a little bit more filming to do in London.
As we are doing some more filming in the tubes Eleanor and I need a change of clothes because this will be in a different part of our music video. We are re-filming us lip-syncing at the tube stations, and we want to give the impression that the tubes are not part of Winter Wonderland.
This post was very helpful to me as it allowed me to make a check list/plan of what was going to happen on the day. This way I can make sure that I have got everything for the day and won’t forget. We needed to do this to make sure we didn’t need to come up again.







Comments