50. Rochester Production Schedule



As I have spoken about before I won't be able to attend this filming day with my team mates. But this is the production plan of what they are going to do and need. 
Date: 9th December 2017 
Time: 12 pm
Characters:
  • Girl One (Paige Anderson)
  • Girl Two (Eleanor Blackman)
Equipment:
  • Camera - To film with
  • Tripod - This was my team can do two person shot
Props:
  • Costumes
  • Food
  • Drink
  • Phones
  • Things available to us on the day

This post was very helpful as I was able to see if my team mates are fully prepared for the day. 

Comments